EXAMPLES

Assembly of the tunnel boring machine at the tunnel Rastatt

For the ARGE Tunnel Rastatt and the Deutsche Bahn AG, the construction of a TVM was documented with two time-lapse cameras. Public webcams for the DB were provided.

Documentation about the prefabrication of a research station, for KAEFER Constructions

Construction documentation of the prefabrication of the new Indian Antarctic research station BHARATI, for KAEFER insulation technology.

HOCHTIEF AG Image movie 2017

Image movie for HOCHTIEF AG. Filmed in Germany, USA, Scotland, Netherlands and Australia. Staged frame story. The end sequence was realized with Greenbox and 3D in compositing.

Separation plant Tunnel Eppenberg

Timelapse film about the construction of a separation plant for WAYSS & FREYTAG Ingenieurbau. Public webcam for the SBB were provided.

Film about the passive protection device Jerseybaer H2 for STRABAG AG

Product film about the in-situ concrete protective wall system Jerseybaer H2 for the STRABAG AG, Cologne.

Timelapse of the construction of the India Antarctica Station BHARATI

TTimelapse movie about the construction of Indian Antarctic Station Bharati for KAEFER Constructions. Project duration 6 months. Constant use of our time-lapse camera in the Antarctic, at temperatures down to -30 degrees!

Shell of a production hall

Timelapse film about the shell of the AL3 production hall for the HYDRO Aluminum Rolles Products in Grevenbroich.

Tunnel Rastatt - construction documentation

For the ARGE Tunnel Rastatt (HOCHTIEF Solutions and Z├╝blin) and Deutsche Bahn AG, we have been documenting the construction of the Rastatt Tunnel in several sub-project films for over three years.